General Information |
Estimated Completion Time |
5 hours (2.5 hours per simulation) |
Description |
Students will apply AWOC concepts in an operational context with two simulations that are run on site using the WES. Simulations are organized and proctored by the local training facilitator. Four cases, complete with simulation guides, are being released for the training facilitators to consider using in AWOC. Each simulation guide contains support materials that illustrate how simulations can be created to support AWOC perfomance objectives. Training facilitators can use these cases and materials for the simulations in AWOC, or they may develop their own simulations using other cases. The two simulations will fulfill the annual WES requirement for the severe convective season. |
Prerequisite(s) |
Llist your prerequisites in a bulleted format:
- Suggested completion of Core Track ICs 1-5 and Severe Track ICs 1-4
|
Lessons
|
Lesson 1:
AWOC Simulations
|
Description |
See description above. |
Estimated Completion Time |
5 hours (2.5 hours per simulation) |
Delivery Method |
|
| Resources |
Exercises |
Instruction from SOO |
Review Sheets / Hand Outs |
Provided by SOO |
Student Guide |
None |
| Reading Material |
Required |
None
|
Recommended |
None |
|
IC Testing |
| None |
Pretest |
 No Practice Test |
No Test Out |
Post Test |
 No Post Test!
|
Contact
|
Email |
IC SVR5 Team |